Capacity and housing system
The number of horses and their housing system determine which rooms are needed. Stall and aisle dimensions and total capacity are defined during the design stage.
ANDREAS MÜLLER · TURNKEY TIMBER CONSTRUCTION
No unexpected costs

Less paperwork
SPACE FOR HORSES AND PEOPLE
From the housing system
to a practical stable layout
Everything, turnkey
Horse safety

What types of timber stables do you build?
We build stables with single or double stalls, paddock access, outdoor stalls and horse shelters. We also construct indoor riding arenas. The internal layout is designed for your project.

Do you build stables for private owners, livery yards and equestrian businesses?
We work with horse owners, livery yards and equestrian businesses. We adapt the dimensions, number of stalls and ancillary rooms to the needs of your facility.

Do you supply only the building or also the internal fittings?
We offer the timber building with its internal layout: stalls, partitions, tack room, feed room and hay storage areas. The fittings supplied and their installation are agreed when preparing the quotation.

Which choices have the greatest effect on cost?
The cost depends on the stable’s dimensions, structure, materials and selected fittings. Each project is priced individually, with the work and fittings included in the quotation clearly stated.
QUOTATION SCOPE
We design the stable, manufacture the timber components in our workshops, then handle delivery and erection. The roof and façades can also be part of the order. The full scope of work is specified in the quotation before construction begins.
QUOTATION SCOPE
The layout can include single or double stalls, partitions, a tack room, a feed room and hay storage areas. Doors, gates, windows and internal fittings are chosen for the project. The quotation specifies the items supplied and the installation of the fittings.
QUOTATION SCOPE
We agree in advance which preparations the client will undertake before delivery and erection. Site, base, access and connection preparations are agreed, along with the division of work between our company and the other parties involved.
THE ELEMENTS OF YOUR PROJECT
ORGANISING THE DAILY WORK
We design the layout around your horses and daily work: stalls, aisles, feed room, tack room and hay storage. Paddock access and pivoting partitions can be provided.
Layout, rooms and daily work
All questions in this section are covered in detail below
The number of horses and their housing system determine which rooms are needed. Stall and aisle dimensions and total capacity are defined during the design stage.
We provide single or double stalls, pivoting partitions and ancillary rooms. Their positions are agreed according to the owner’s needs and the building’s characteristics.
If the stable needs to connect to an indoor riding arena or an existing building, this is considered from the design stage. The solution depends on the positioning and structure of the buildings.
The stable can include a tack room, feed room and hay and straw storage. A wash bay, grooming area and equipment room are considered separately according to your needs.
The positioning of stalls, doors and aisles takes account of how horses and people move around. The layout should make access to the animals and care areas easier.
The layout takes account of how you feed the horses and clean the stable, by hand or with machinery. This determines the aisles, access points and location of storage areas.
If machinery needs to enter the building, its dimensions are considered when choosing gates and aisles. The space needed for circulation and manoeuvring is defined for each project.
Stalls, hay and straw storage, tack room and feed room have separate spaces. Each activity therefore has its own place.
If a room for veterinary care or temporarily separate accommodation is needed, its use and fittings are considered during project preparation.
The layout and paddock access are considered in relation to the arena, pastures and farm buildings. Connections between these areas are agreed for each site.
HOW THE BUILDING WORKS
The diagram shows air entering at the eaves and leaving through the ridge. Stall windows and adjustable ventilation louvres above them can be provided. Separate air inlets allow the stable to be ventilated even when the doors are closed.
Daylight can enter through stall windows, translucent strips high in the walls and a translucent ridge. Combining side lighting and overhead lighting helps illuminate both the aisle and the rear of the rooms.
To limit heat build-up, a roof with an insulating layer and overhangs that shade the windows can be provided, particularly on the south side. These measures complement ventilation: they reduce heat entering the building, while air exchange helps remove it.
How is stable ventilation adjusted for different seasons?
Adjustable ventilation louvres allow the opening to suit the weather conditions. Operation can be manual or electric. Separate ventilation components allow air intake to be regulated without opening the stable’s main doors.
Which opening components allow air exchange to be regulated?
A split stable door allows the upper section to be opened while the lower section remains closed. Door stays help keep the leaves open in windy conditions. Translucent parts within reach of horses can be protected with a grille.
How are timber components in direct contact with horses protected against biting, impacts and other mechanical damage?
An anti-chew profile can protect the top edge of a door within the horse’s reach. Infill made from replaceable boards simplifies repairs: a damaged board can be replaced while retaining the frame.
Which construction details protect timber against high humidity, wet bedding and washing?
In areas with wet bedding, the bottom board can be made from a more resistant timber species. In wash bays, concrete walls can replace exposed timber cladding. The material is therefore chosen according to each area’s contact with moisture.
Which requirements are considered when designing a stable?
The stable layout is adapted to the horses’ size and housing system. For an adult horse’s individual stall, around 12 to 16 m² is an initial guide.
The stable’s characteristics are defined with regard to the regulations and professional recommendations of the country where it is built:
Which part of compliance with these requirements is your company responsible for?
We manufacture and erect the structures and fittings included in the order in accordance with the agreed design. The architect coordinates the layout with horse accommodation requirements and the conditions of the building permit; the engineer calculates the load-bearing structures. The required documents and the involvement of these specialists are defined when the order is agreed.

Timber cladding, metal grilles and independent stall entrances.

Open section of the building with an outdoor area in front of the stable.

Timber stalls opening onto an enclosed outdoor area.
FREE PRELIMINARY ESTIMATE
The cost of a stable is calculated for each project. For the same floor area, the price varies with the building structure, number of stalls, fittings and site conditions.
To avoid unexpected costs caused by an unclear quotation, we agree in advance what is included and what is priced separately.
To get started, we only need the approximate building dimensions, number of horses and construction location.



Single or double stalls can open onto a paddock, an enclosed turnout area adjoining the stable.
When the exit is open, the horse can move freely between the stall and the outdoor area. A small adjoining paddock supplements daily turnout but does not replace an area that allows sufficient movement.
Outdoor areas can be directly in front of the stalls or separate from the building. An exit from the paddock to the pastures shortens routes and reduces horse traffic through the internal aisle. A shared turnout area and individual paddocks can form distinct zones on the site.
Timber shelters with monopitch or pitched roofs, including models enclosed on three sides, are provided for outdoor areas. The walls are made from solid timber elements or overlapping boards.
Fencing can use galvanised steel tube panels and gates with protected latches. Pivoting panels allow access for cleaning several adjacent paddocks. For mechanical mucking out, the access width and ground strength are adapted to the machinery used.




Aisles, stalls and the wash bay need flooring suited to their use.
One option is a concrete base with rubber flooring in selected areas. The mats are laid on a firm, level surface: they follow unevenness in the base rather than correcting it.
In aisles, wear resistance and easy cleaning are important; in the resting area, surface resilience matters, while the wash bay needs hoof grip on wet flooring. Rubber mats are available for these uses. If machinery uses the aisle, the flooring must be checked for compatibility with that load.
In the wash bay, the floor slopes towards a floor drain or drainage channel. The slope is formed in the base and the flooring is adapted to the drain’s position. Wash water is therefore directed towards the outlet without pooling under the horse’s feet.
Water supply and wastewater drainage can form part of the agreed scope for a turnkey build.
Water can be supplied to automatic drinkers and the horse wash bay. Pipes and fittings within the animals’ reach are protected against biting and damage.
For winter water supply, heated drinkers, pipe insulation and heating cables can be used. Another option is a loop with water circulation and heating. Protection covers the entire system: a heated drinker does not prevent its supply pipe from freezing. Branches without circulation are protected separately.
Construction location, dimensions and number of horses.
Layout, structure and fittings.
Work, scope of supply and price.
Preparing the structures in our workshops.
Delivery and assembly on site.
The overall timeframe includes project preparation and approval, component manufacture, delivery and on-site work. It depends on the progress of permits and foundations, the planned fittings and approval of the final dimensions. Fast erection of the frame does not mean the entire facility will be ready within the same timeframe.
At delivery, the foundations specified in the design, access and unloading area must be ready. Their readiness is checked before erection, and responsibilities and unloading arrangements are agreed.
Preparatory work can be included in the order or carried out separately. The division of work is specified in the project scope.
We use our own lifting equipment to lift and erect the structures.
Access and the area near the building must allow vehicles to pass, unloading to take place and machinery to be set up securely. Clear width and height, access to the erection location and ground conditions are checked. The required dimensions and bearing capacity are defined for the actual machinery and erection plan.
We renovate agricultural and other buildings.
Before conversion, it is necessary to check whether the building can legally be used to accommodate horses.
Walls and a roof alone do not make a building suitable as a stable: stall positioning, headroom under beams, aisles and ventilation options are checked.
An initial assessment requires a plan or measured survey, internal and external photos and information about the building’s condition. The plan shows columns, clearance beneath the lowest beam, door widths, window positions and existing water supplies.
This information allows the stall and aisle layout and access for mucking-out machinery to be checked.
Low beams can hinder stall positioning, columns can obstruct an aisle and narrow gates can prevent mucking-out machinery from entering. If the desired layout requires a load-bearing support to be moved, this is considered together with the structural alteration.
Other constraints include the absence of permission to accommodate horses or a necessary change of use.
Additional stalls can be housed in an extension; the possibility of extending depends on the structure of the existing building.
An extension study considers available space, connections to aisles and exits, roof junctions and drainage. Adding stalls at the end of a building and creating an upper storey above an existing stable are different operations in terms of loads and structure.
If a second phase is already being considered, it is useful to identify the extension side from the outset and retain access to it. It is better to avoid placing rooms or equipment there that would later need to be moved.
The future connection between buildings, extension of the water network and rainwater drainage are best shown on the initial plan. Necessary alterations can then be identified before the first construction phase.
The construction area is fenced and access is restricted. Materials are stored within it; routes for erection machinery are separated from pedestrian routes.
At an equestrian facility, the horses’ exit route, unloading area and open excavations are identified in advance. Before work begins, it must be clear which doors and aisles will be temporarily closed and how the rest of the building will be used.
Work at an operating site is possible if the construction area can be safely separated from the rooms in use.
For example, one wing can be renovated separately if the other part retains access, water and a safe exit for the horses. If work affects the shared aisle or the roof above occupied stalls, their use is considered case by case; temporary relocation of the horses may be necessary.
Doors, locks, hinges, rollers, tracks and partition fixings are checked in the stalls.
For stall fittings, a weekly check is a practical guide: the door should slide without sticking, the lock should close fully and fixings should not be loose. The roof and gutters are checked separately: twice a year, fixings are inspected and leaves removed from the gutters.
The more dust and bedding collect in the tracks, the more frequent cleaning needs to be. For door mechanisms, cleaning every three months is a guide; trapped straw and manure are removed immediately. Readjustment may be needed in the first months after erection: drying of the base, humidity changes and pressure from horses against partitions can alter door alignment.
If a lock no longer engages or a door sticks, it is checked before the next use rather than waiting for the scheduled inspection.
With routine bedding management, manure and wet areas are removed at least once a day and replaced with dry bedding. Deep-litter bedding follows a different protocol: dry material is added daily and complete mucking out is carried out according to the chosen method.
After a full wash, drinkers are emptied, water is removed from surfaces and the room is ventilated. Horses only return to the stall once it is completely dry. For planning purposes, an indicative drying time of 1 to 2 days can be allowed; the actual time depends on temperature and humidity.
The external timber finish, door rollers, hinges and locks may need renewal.
The type of defect determines the action: a broken board with sharp splinters must be replaced; a sticking door is first checked for dirt or incorrect adjustment. Timber that has greyed in the sun is not necessarily rotten or weakened.
How often an external finish needs renewal depends on the timber species, product and exposure to rain and sun. For outdoor stalls in Douglas fir treated with a protective wood oil, renewal every 2 to 4 years is a practical guide, to be confirmed against the chosen product’s instructions.
This 2-to-4-year interval does not apply to every paint. Locks, hinges and boards are replaced according to wear or damage, independently of renewing the façade finish.
Where mechanical mucking out is planned, pivoting or sliding partitions allow stalls to be opened for machinery. Opening and aisle dimensions are adapted to the machine used in the stable.
To simplify repairs, it is useful to be able to replace a board or door roller without dismantling the entire partition. The wearing part can then be serviced while retaining the surrounding components in good condition.







CONTRACTOR PROFILE
Services and information about our company on the construction platform.

COMPANY AND EMPLOYER
Information about our activities and working in the region.
Belgium · Luxembourg · Germany · the Netherlands · France · Switzerland
Our office and in-house production facility are located in Espeler (Belgium), Mühlenstrasse 78.
After production, we prepare the timber components for transport and subsequent assembly on the building site.
We have our own crane equipment for lifting and erecting the structures. We organise delivery and erection to suit the location and site conditions.


READY TO GET STARTED?
Tell us about your project: we will clarify the dimensions, intended use and next step.
STILL CONSIDERING YOUR OPTIONS?
Follow our completed projects and construction progress on Facebook.