CLT plate transport system in Brussels, Belgium

Holzbau Andreas Müller System for lifting the cross-laminated wood panel (12m long, 1.6 tonnes) flat and then raising it.

Difficult operation because there is not much space on the roof in the hall of the historical railway station.